Albrecht Engineering provided on-site special inspections of reinforcing bars, formwork, concrete placement, masonry, and structural steel for the Northeast River Wastewater Treatment Plant Enhanced Nutrient Removal Upgrade.
Albrecht Engineering prepared daily reports and maintained records of photographs of all stages of construction. Arranged specialty testing including concrete sampling and testing. Utilized Primavera and Sharepoint to document photographs, submittal reviews, and construction inspection reports.