Durrett Shepard

The project consists of the design of a 7,500 square foot addition to a steel fabrication plant for additional office space. The addition is an architecturally exposed structural steel building with interior and exterior steel, requiring reduction and prevention of a thermal bridge. The structure included theuse of painted, galvanized, and weathering steel.

Read More

photo-durret