WWTP
-
WWTP
DC Water Division D: JBAB Diversion and Overflow Structures – Washington, D.C.
Project Design Leader responsible for overseeing all structural design and preparation of structural construction documents, client coordination, and assembly of submission packages. The scope of work included the design of a buried concrete odor control facility adjacent to an existing concrete drop shaft structure and the design of a new concrete cover and internal structures for the drop shaft. All design performed was in accordance with drawings and specifications provided by the Owner.